This item contains the following components:
Strongest mobile hydraulic tool for the bodywork repair.
The Docking Station DS XT2 supplementary unit is an addition to TKR`s PNP 90 XT2 stamping and riveting tool. It ensures consistent quality for the riveting process. If the operating pressure drops below 6 bar (required minimum operation pressure), th operator will be informed via optical indicator (red LED) and the pressure accumulator will take over the pressure supply.
2-Circuit-Hydraulik (Push & Pull)
An existing PNP 90 XT2 is upgradable by using the Docking Station DC XT2
Easy handling by external pump-system
Combination with existing riveting tools possible
Infinite adjustment of the working pressure
Processing high-strength materials
Clear order through colour coding and labelling of the rivet inserts
Pressure Generator PNP 90 XT2
Docking Station DS XT2
Hydraulic Actuator HA XT2
Handle M8
Riveting Tool Kit "JLR XT2"
Hose Package "Duo"
Riveting Clamp NB45
Trolley with tray
Cover for trolley